Case Hefei South Railway Station project

Hefei South Station Project

Date: 2018-11-08
Browse times: 6

 The projects of Hefei South Railway Station are mostly located in cities, and the construction site is restricted by urban traffic, people flow and traffic flow. The weight of platinum gravel plastic formwork is only 13Kg/, and there is no need for crane in the process of installation, removal and transshipment of formwork. The platinum gravel plastic resistant formwork is a composite formwork with back ribs, without wood and nails. The template is connected by a clip-back button, which is convenient for installation and removal. Platinum gravel plastic resistant formwork has been successfully applied to Fuyang Viaduct in Hefei, North Ring Tunnel in Tongzhou, Yuhang High-tech Bridge and other projects.


Last article:noneNext article:none
Case / Related cases
2018 - 11 - 05
Ankang Baihe County Pipeline Corridor Project is a smart city infrastructure project, mostly open-cut or shield construction. The construction section is long, the construction period is long, and the...
2018 - 11 - 05
The underground comprehensive pipeline Gallery Project of Liusheng Road is the foundation project of intelligent city, mostly open-cut or shield construction. The construction section is long, the con...
2018 - 11 - 05
Guanghua Pipe Gallery Project in Guangzhou is a foundation project of smart city, mostly open-cut or shield construction. The construction section is long, the construction period is long, and the ins...
  • Wechat public address
Address: No. 388 Guangzhong Road, Minhang District, Shanghai
Telephone:021-64509038
Fax:021-33587637
Zip code:201108
Copyright ©2018 - 2019 Shanghai Polyural Material Technology Co.,Ltd.
犀牛云提供企业云服务