Case Case
Case Foshan line 2 project

Foshan Metro Line 2 Project

Date: 2018-11-08
Browse times: 4

Foshan Metro Line 2 project, as the main artery of urban public transport, has very high quality requirements for its construction. Metro stations are mostly underground construction, and track bed construction is long along the line. The formwork installation, demolition and turnover are mostly carried by manual. Platinum gravel plastic formwork has been successfully applied in Suzhou Metro Line 1, Ningbo Metro Line 2, Foshan Metro Line 1, Shanghai Metro Line 11, Shanghai Songjiang Tramway and Suzhou Tramway with its portability, waterproof and high turnover times. It has brought great benefits to the quality of the project while ensuring the quality of the project. Economy.


Last article:noneNext article:none
Case / Related cases
2018 - 11 - 05
Ankang Baihe County Pipeline Corridor Project is a smart city infrastructure project, mostly open-cut or shield construction. The construction section is long, the construction period is long, and the...
2018 - 11 - 05
The underground comprehensive pipeline Gallery Project of Liusheng Road is the foundation project of intelligent city, mostly open-cut or shield construction. The construction section is long, the con...
2018 - 11 - 05
Guanghua Pipe Gallery Project in Guangzhou is a foundation project of smart city, mostly open-cut or shield construction. The construction section is long, the construction period is long, and the ins...
  • Wechat public address
Address: No. 388 Guangzhong Road, Minhang District, Shanghai
Telephone:021-64509038
Fax:021-33587637
Zip code:201108
Copyright ©2018 - 2019 Shanghai Polyural Material Technology Co.,Ltd.
犀牛云提供企业云服务