Case Case
Case Pipe Gallery
  • Your present position: Home Case
Release time: 2018 - 11 - 08 Clicks: 4
Xianning wave retaining wall projects are mostly located in remote areas, near rivers, lakes and seas, and there is more water in the construction area. Platinum gravel plastic formwork is hydrophobic material. Wind, sun, cold and heat have no effect on the performance and geometric size of the formwork. The weight of platinum gravel formwork is only 13Kg/, and there is no need for crane assistanc...
Release time: 2018 - 11 - 05 Clicks: 7
Guangzhou Huadu Metro Project, as the main artery of urban public transport, has a high quality requirement for its construction. Metro stations are mostly underground construction, and track bed construction is long along the line. The formwork installation, demolition and turnover are mostly carried by manual. Platinum gravel plastic formwork has been successfully applied in Suzhou Metro Line 1,...
Release time: 2018 - 11 - 08 Clicks: 5
As the main artery of urban public transport, the project of Suzhou tramway requires very high quality of its construction. Metro stations are mostly underground construction, and track bed construction is long along the line. The formwork installation, demolition and turnover are mostly carried by manual. Platinum gravel plastic formwork has been successfully applied in Suzhou Metro Line 1, Ningb...
Release time: 2018 - 11 - 08 Clicks: 4
As the main artery of urban public transport, Shanghai Metro Line 11 has a high quality requirement for its construction. Metro stations are mostly underground construction, and track bed construction is long along the line. The formwork installation, demolition and turnover are mostly carried by manual. Platinum gravel plastic formwork has been successfully applied in Suzhou Metro Line 1, Ningbo ...
Release time: 2018 - 11 - 08 Clicks: 2
As the main artery of urban public transport, urban rail transit requires high quality of its construction. Metro stations are mostly underground construction, and track bed construction is long along the line. The formwork installation, demolition and turnover are mostly carried by manual. Platinum gravel plastic formwork has been successfully applied in Suzhou Metro Line 1, Ningbo Metro Line 2, ...
Release time: 2018 - 11 - 08 Clicks: 3
As the main artery of urban public transport, the project of Suzhou Metro Line 1 requires very high quality of its construction. Metro stations are mostly underground construction, and track bed construction is long along the line. The formwork installation, demolition and turnover are mostly carried by manual. Platinum gravel plastic formwork has been successfully applied in Suzhou Metro Line 1, ...
  • Wechat public address
Address: No. 388 Guangzhong Road, Minhang District, Shanghai
Telephone:021-64509038
Fax:021-33587637
Zip code:201108
Copyright ©2018 - 2019 Shanghai Polyural Material Technology Co.,Ltd.
犀牛云提供企业云服务